{"id":1129,"date":"2022-03-26T12:17:48","date_gmt":"2022-03-26T12:17:48","guid":{"rendered":"https:\/\/d.cc1.vn\/?p=1129"},"modified":"2022-09-23T15:43:17","modified_gmt":"2022-09-23T08:43:17","slug":"cc1-mo-rong-thi-truong-trong-khu-vuc-bang-viec-tham-gia-thi-cong-nang-cap-quoc-lo-5-tai-campuchia","status":"publish","type":"post","link":"https:\/\/www.cc1.vn\/en\/2022\/03\/26\/cc1-mo-rong-thi-truong-trong-khu-vuc-bang-viec-tham-gia-thi-cong-nang-cap-quoc-lo-5-tai-campuchia.html","title":{"rendered":"CC1 expands the market in area by participating in the construction of upgrading National Highway 5 in Cambodia"},"content":{"rendered":"<p><em>On March 24, 2022, Construction Corporation No. 1 \u2013 JSC (CC1) together with Traffic Construction Corporation 6 \u2013 JSC (CIENCO6) signed a contract for the construction of Package 4 of the renovation project. and upgrading National Highway 5 in Cambodia. This is the first step in CC1&#039;s strategic vision of reaching out to foreign markets and pursuing the goal of becoming a prestigious and world-class construction group of CC1. \u00a0<\/em><\/p>\n\n\n\n<p>After a period of exploration and preparation of resources, Construction Corporation No. 1 - JSC (CC1) is ready to deploy cooperation to foreign markets with an overseas project starting in Cambodia. That is reflected in the signing ceremony of Contract for Construction of Package 4, renovation and upgrading of National Highway 5 with the Ministry of Transport and Public Works of the Kingdom of Cambodia. The signing ceremony was attended by representatives of the Investor, Mr. Sun Chanthol - Minister of Transport and Public Works of the Kingdom of Cambodia, leaders of the Ministry of Transport and Public Works, Mr. Le Huu Viet Duc - General Director of CC1 and other representatives. of the Contractor's Consortium.\u00a0<\/p>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-full is-resized\"><img loading=\"lazy\" src=\"https:\/\/d.cc1.vn\/wp-content\/uploads\/2022\/04\/01.jpg\" alt=\"\" class=\"wp-image-1130\" width=\"961\" height=\"640\"\/><figcaption><em>Contract signing ceremony between the Investor - Ministry of Transport and Public Works of the Kingdom of Cambodia and the CC1-CIENCO6 contractor consortium<\/em><\/figcaption><\/figure><\/div>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-full is-resized\"><img loading=\"lazy\" src=\"https:\/\/d.cc1.vn\/wp-content\/uploads\/2022\/04\/02-1.jpg\" alt=\"\" class=\"wp-image-1131\" width=\"961\" height=\"624\"\/><figcaption><em>Mr. Sun Chanthol - Minister of Transport and Public Works of the Kingdom of Cambodia (Investor) and Mr. Le Huu Viet Duc - General Director of CC1 (Consortium of CC1-CIENCO6) signed the contract.<\/em><\/figcaption><\/figure><\/div>\n\n\n\n<p>Accordingly, the investment project to build the Sri Sophorn - Poipet route in Cambodia has a length of 35.14 km. The project includes key contents such as: Expanding asphalt roads, constructing drainage systems, safety systems and traffic signs, etc. Estimated construction time is 32 months with contract value. nearly 53 million USD. At the signing ceremony, the CC1-CIENCO6 contractor consortium committed to complete the project on schedule, ensuring quality, labor safety and environmental sanitation. At the same time, through this project is also an opportunity to tighten diplomatic relations between the two neighboring countries Vietnam and Cambodia.\u00a0<\/p>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-full is-resized\"><img loading=\"lazy\" src=\"https:\/\/d.cc1.vn\/wp-content\/uploads\/2022\/04\/03-1.jpg\" alt=\"\" class=\"wp-image-1132\" width=\"956\" height=\"637\"\/><figcaption><em>Speech by Mr. Le Huu Viet Duc \u2013 General Director of CC1, on behalf of the CC1-CIENCO6 contractor consortium at the Signing Ceremony<\/em><\/figcaption><\/figure><\/div>\n\n\n\n<p>With technical advantages and experience in construction and project management along with financial potential, CC1 is one of the rare units to conquer and reach out to the foreign construction market with large-scale projects. In addition, CC1 recently constructed and completed large traffic projects that met the requirements of progress, quality and safety such as: Danang - Quang Ngai expressway (package A1), development Hai Phong urban traffic (contract package CW3A &amp; CW4A), Ho Chi Minh road (section La Son - Tuy Loan), coastal road Hai Phong - Thai Binh, Thu Thiem bridge, Hoa An bridge, Dong Nai bridge and route 2 bridgeheads, etc.<\/p>\n\n\n\n<p>\u201cIt can be said that this is the first step in realizing the strategic goal of reaching out to the international market and positioning CC1's brand in the new period. This is also considered a clear demonstration of the ability of Vietnamese enterprises to export construction services to foreign markets\u201d, shared Mr. Le Huu Viet Duc \u2013 General Director of CC1.\u00a0<\/p>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-full is-resized\"><img loading=\"lazy\" src=\"https:\/\/d.cc1.vn\/wp-content\/uploads\/2022\/04\/04-1.jpg\" alt=\"\" class=\"wp-image-1133\" width=\"951\" height=\"634\"\/><figcaption><em>Speech by Mr. Sun Chanchol, Minister of Transport and Public Works of the Kingdom of Cambodia at the Signing Ceremony<\/em><\/figcaption><\/figure><\/div>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-full is-resized\"><img loading=\"lazy\" src=\"https:\/\/d.cc1.vn\/wp-content\/uploads\/2022\/04\/05.jpg\" alt=\"\" class=\"wp-image-1134\" width=\"961\" height=\"641\"\/><figcaption><em>Mr. Sun Chanchol - Minister of Transport and Public Works of the Kingdom of Cambodia speaks to Cambodian media<\/em><\/figcaption><\/figure><\/div>\n\n\n\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>On March 24, 2022, Construction Corporation No. 1 - JSC (CC1) together with Transport Construction Corporation No. 6 - JSC (CIENCO6) signed the Construction Contract for Package No. 4 of the renovation project. and upgrading National Highway 5 in Cambodia. This is the first step in the strategic vision [...]<\/p>","protected":false},"author":1,"featured_media":1271,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[63],"tags":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.cc1.vn\/en\/wp-json\/wp\/v2\/posts\/1129"}],"collection":[{"href":"https:\/\/www.cc1.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.cc1.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.cc1.vn\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.cc1.vn\/en\/wp-json\/wp\/v2\/comments?post=1129"}],"version-history":[{"count":5,"href":"https:\/\/www.cc1.vn\/en\/wp-json\/wp\/v2\/posts\/1129\/revisions"}],"predecessor-version":[{"id":8676,"href":"https:\/\/www.cc1.vn\/en\/wp-json\/wp\/v2\/posts\/1129\/revisions\/8676"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.cc1.vn\/en\/wp-json\/wp\/v2\/media\/1271"}],"wp:attachment":[{"href":"https:\/\/www.cc1.vn\/en\/wp-json\/wp\/v2\/media?parent=1129"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.cc1.vn\/en\/wp-json\/wp\/v2\/categories?post=1129"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.cc1.vn\/en\/wp-json\/wp\/v2\/tags?post=1129"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}