{"id":13705,"date":"2024-01-27T09:42:00","date_gmt":"2024-01-27T02:42:00","guid":{"rendered":"https:\/\/www.cc1.vn\/?p=13705"},"modified":"2024-01-30T09:52:51","modified_gmt":"2024-01-30T02:52:51","slug":"cc1-to-chuc-le-ky-ket-hop-dong-voi-tap-doan-dien-khi-dong-phuong-quoc-te-dec-intl","status":"publish","type":"post","link":"https:\/\/www.cc1.vn\/en\/2024\/01\/27\/cc1-to-chuc-le-ky-ket-hop-dong-voi-tap-doan-dien-khi-dong-phuong-quoc-te-dec-intl.html","title":{"rendered":"CC1 ORGANIZED A CONTRACT SIGNING CEREMONY WITH DONG PHUONG INTERNATIONAL ELECTRICAL GROUP (DEC INTL.)"},"content":{"rendered":"<p><em>On the afternoon of January 26, 2024 at the Corporation Headquarters, CC1 held a contract signing ceremony with the subcontractor, Dongfang Electric International Corporation (DEC Intl.), to provide Equipment. and main materials for Na Duong II Thermal Power Plant in Lang Son province.<\/em><\/p>\n\n\n\n<p>Attending the signing ceremony, on CC1&#039;s side, there was the presence of Mr. Dinh Van Hung - Deputy General Director of Industrial Construction and management level officials. On DEC Intl.&#039;s side, there was the participation of Mr. Ma Jian - Deputy General Director and members of the negotiating team.<\/p>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" src=\"https:\/\/www.cc1.vn\/wp-content\/uploads\/2024\/01\/LKHD_01.jpg\" alt=\"\" class=\"wp-image-13707\" width=\"1156\" height=\"797\"\/><figcaption><strong><em>Mr. Dinh Van Hung - Deputy General Director of Industrial Construction and CC1 management level officials at the signing ceremony<\/em><\/strong><\/figcaption><\/figure>\n\n\n\n<p>During the past 44 years, CC1 has been known as one of the leading investment and construction enterprises in Vietnam in the fields of industrial, energy, civil, transportation and technical infrastructure projects. With unremitting efforts, CC1 has engraved its name on thousands of projects spread across the country. Recently, CC1 has participated in many key national projects such as: Passenger Terminal T3 - Tan Son Nhat International Airport - Ho Chi Minh City, Passenger Terminal - Long Thanh International Airport (Phase 1 ), Phu Tho Circus and multi-purpose performance - Ho Chi Minh City, Dak Nong Provincial General Hospital, City Central Square. Gia Nghia - Dak Nong, Investment project to build Dai Ngai Bridge through the provinces of Can Tho - Soc Trang and a series of bidding packages for investment project to build Ring Road 3 through the city. Thu Duc and City. HCM,\u2026<\/p>\n\n\n\n<p>Meanwhile, DEC Intl. is an electric and gas corporation headquartered in Chengdu city, Sichuan province (China), since 1971, DEC Intl. has expanded operations to nearly 80 countries and regions on 5 continents. With a total installed capacity exceeding 84,000 MW, DEC Intl. has set a record of supplying about one-third of China&#039;s power equipment and become one of the largest power equipment manufacturing groups in the world.<\/p>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" width=\"1298\" height=\"873\" src=\"https:\/\/www.cc1.vn\/wp-content\/uploads\/2024\/01\/LKHD_02.jpg\" alt=\"\" class=\"wp-image-13708\"\/><figcaption><strong><em>Mr. Ma Jian - Deputy General Director of Dongfang Electric Power Group and members of the delegation<\/em><\/strong><\/figcaption><\/figure>\n\n\n\n<p>In Vietnam, DEC Intl. has won a number of power industry bidding packages such as: Duyen Hai 3 Thermal Power Plant Project, Hai Phong 1 and 2 Thermal Power Plant Project. Since 2013, DEC Intl. has established its headquarters in Vietnam with the goal of promoting international cooperation in production capacity and equipment manufacturing, providing system solutions for infrastructure and energy development in Vietnam as well as other countries. countries in the region.<\/p>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" width=\"1297\" height=\"920\" src=\"https:\/\/www.cc1.vn\/wp-content\/uploads\/2024\/01\/LKHD_03.jpg\" alt=\"\" class=\"wp-image-13709\"\/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" width=\"1297\" height=\"1037\" src=\"https:\/\/www.cc1.vn\/wp-content\/uploads\/2024\/01\/LKHD_04.jpg\" alt=\"\" class=\"wp-image-13710\"\/><figcaption><strong><em>Representative CC1 and DEC Intl. officially signed the contract<\/em><\/strong><\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" width=\"1298\" height=\"924\" src=\"https:\/\/www.cc1.vn\/wp-content\/uploads\/2024\/01\/LKHD_05.jpg\" alt=\"\" class=\"wp-image-13711\"\/><figcaption><strong><em>And exchange meaningful souvenirs<\/em><\/strong><\/figcaption><\/figure>\n\n\n\n<p>Contract signing ceremony between CC1 and DEC Intl. This is an important event, marking the extensive cooperative relationship between the two sides. CC1 and DEC Intl. confirming commitment, consensus and maximizing the strengths of both parties in implementing the EPC contract for Na Duong II Thermal Power Plant project as well as many new projects in the near future.<\/p>","protected":false},"excerpt":{"rendered":"<p>On the afternoon of January 26, 2024 at the Corporation Headquarters, CC1 held a contract signing ceremony with the subcontractor, Dongfang Electric International Corporation (DEC Intl.), to provide Equipment. and main materials for Na Duong II Thermal Power Plant [...]<\/p>","protected":false},"author":2,"featured_media":13710,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[63],"tags":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.cc1.vn\/en\/wp-json\/wp\/v2\/posts\/13705"}],"collection":[{"href":"https:\/\/www.cc1.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.cc1.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.cc1.vn\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.cc1.vn\/en\/wp-json\/wp\/v2\/comments?post=13705"}],"version-history":[{"count":1,"href":"https:\/\/www.cc1.vn\/en\/wp-json\/wp\/v2\/posts\/13705\/revisions"}],"predecessor-version":[{"id":13712,"href":"https:\/\/www.cc1.vn\/en\/wp-json\/wp\/v2\/posts\/13705\/revisions\/13712"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.cc1.vn\/en\/wp-json\/wp\/v2\/media\/13710"}],"wp:attachment":[{"href":"https:\/\/www.cc1.vn\/en\/wp-json\/wp\/v2\/media?parent=13705"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.cc1.vn\/en\/wp-json\/wp\/v2\/categories?post=13705"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.cc1.vn\/en\/wp-json\/wp\/v2\/tags?post=13705"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}