{"id":17095,"date":"2025-04-13T09:53:11","date_gmt":"2025-04-13T02:53:11","guid":{"rendered":"https:\/\/www.cc1.vn\/?p=17095"},"modified":"2025-04-15T08:37:58","modified_gmt":"2025-04-15T01:37:58","slug":"giai-phap-thi-cong-cau-can-huong-den-phat-trien-giao-thong-ben-vung","status":"publish","type":"post","link":"https:\/\/www.cc1.vn\/en\/2025\/04\/13\/giai-phap-thi-cong-cau-can-huong-den-phat-trien-giao-thong-ben-vung.html","title":{"rendered":"VIAWAY CONSTRUCTION SOLUTIONS TOWARDS SUSTAINABLE TRANSPORT DEVELOPMENT"},"content":{"rendered":"<p>Many solutions for constructing elevated bridges on transportation projects, especially highways, aimed at saving costs, ensuring the longevity of the structures, and particularly minimizing negative impacts on the environment, were discussed and shared by experts, engineers, and consulting firms at the scientific workshop: &quot;Elevated Bridge Solutions for Transportation Infrastructure in the Southern Region&quot; organized by Construction Corporation No. 1 - JSC on April 12th.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" width=\"800\" height=\"450\" src=\"https:\/\/www.cc1.vn\/wp-content\/uploads\/2025\/04\/anh-1-nhan-dan.webp\" alt=\"\" class=\"wp-image-17096\"\/><figcaption><strong><em>Construction of bridges and roads for the Ho Chi Minh City Ring Road 3 project (Photo: TH\u1ebe ANH)<\/em><\/strong><\/figcaption><\/figure>\n\n\n\n<p>The solution of constructing elevated bridges is being considered in the context of the southern region, especially the Mekong Delta, facing a series of challenges such as: shortages of embankment materials, weak geological conditions, and stringent environmental protection requirements.<\/p>\n\n\n\n<p>Dr. Phan Huu Duy Quoc, Chairman of the Board of Directors of Construction Corporation No. 1 - JSC, and a member of the expert consulting team for the Ho Chi Minh City urban railway system construction project, provided survey information showing the urgency of elevated bridge solutions in the development of Vietnam&#039;s transportation infrastructure in general and the southern region in particular.<\/p>\n\n\n\n<p>Accordingly, the amount of sand currently being dumped into the Mekong Delta is only 2 to 4 million cubic meters.<sup>3<\/sup>\/year while extraction capacity is 10 times higher: 35-55 million m\u00b3<sup>3<\/sup>\/year to serve the construction of bridges, roads, and highways. Thus, the supply of sand is too low compared to the demand because currently, the highway system in the south, which is over 1,000km long, is being invested in and built, leading to a very serious shortage of construction sand.<\/p>\n\n\n\n<p>&quot;Given this situation, finding sustainable infrastructure solutions that are suitable for local conditions has become an urgent requirement. Among these solutions, elevated bridges offer a way to address material shortages and minimize the environmental impact of roads built on embankments, while also shortening construction time,&quot; Mr. Phan Huu Duy Quoc observed.<\/p>\n\n\n\n<p>Experts also argue that, in addition to focusing solely on cost, the impact of transportation infrastructure projects on the environment and sustainable development should be thoroughly considered when constructing elevated bridges.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" width=\"790\" height=\"445\" src=\"https:\/\/www.cc1.vn\/wp-content\/uploads\/2025\/04\/ANH-QUOC-PHAT-BIEU.webp\" alt=\"\" class=\"wp-image-17097\"\/><figcaption><strong><em>Mr. Phan Huu Duy Quoc, Chairman of the Board of Directors of Construction Corporation No. 1 \u2013 JSC (CC1), and Deputy Secretary General of the Vietnam Concrete Association, presented at the scientific conference.<\/em><\/strong><\/figcaption><\/figure>\n\n\n\n<p>The workshop also featured Mr. Nguyen Huu Duong, General Director of Hoa Binh Company Limited, who has pioneered the research and implementation of elevated bridge solutions in the northern region.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" width=\"2560\" height=\"1707\" src=\"https:\/\/www.cc1.vn\/wp-content\/uploads\/2025\/04\/hinh-bac-Duong.jpg\" alt=\"\" class=\"wp-image-17098\"\/><figcaption><strong><em>Mr. Nguyen Huu Duong, General Director of Hoa Binh Company Limited, shared inspiring perspectives and stories about elevated bridge solutions with the program. <\/em><\/strong><\/figcaption><\/figure>\n\n\n\n<p>Speaking at the workshop, Professor Nguyen Ngoc Tran, former Vice Chairman of the State Committee for Science and Technology, expressed his concern: \u201cThe elevated bridge solution is not new, but why isn&#039;t it being applied when sand dredging in the Mekong Delta is reaching its limit? What will happen to the environment and the lives of the people if roads continue to be built using sand embankments, causing consequences such as soil acidification and salinization\u2026?\u201d<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" width=\"2560\" height=\"1707\" src=\"https:\/\/www.cc1.vn\/wp-content\/uploads\/2025\/04\/ngoc-tran.jpg\" alt=\"\" class=\"wp-image-17099\"\/><figcaption><em><strong>Professor Nguyen Ngoc Tran warns of the unpredictable consequences of introducing saline elements into freshwater ecosystems by using sea sand instead of river sand for land reclamation.<\/strong> <\/em><\/figcaption><\/figure>\n\n\n\n<p>To further illustrate, Mr. Quoc stated that the country&#039;s first expressway, the Ho Chi Minh City-Trung Luong expressway, was started in 2004 with 14 out of 61 km constructed as elevated bridges. Therefore, this solution is not new; the issue is how to apply it effectively, or whether the government needs to soon establish standardized regulations on elevated bridge construction methods.<\/p>\n\n\n\n<p>At the workshop, construction and consulting firms shared many advanced technologies in the design and construction of viaducts, aiming to optimize investment costs while ensuring the longevity and quality of the structures. These solutions attracted attention and generated lively discussions among experts and delegates in attendance.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" width=\"1280\" height=\"854\" src=\"https:\/\/www.cc1.vn\/wp-content\/uploads\/2025\/04\/hinh-anh-nghia.jpg\" alt=\"\" class=\"wp-image-17100\"\/><figcaption><strong><em>Mr. Nguyen Trong Nghia, General Director of Invest Global Consulting and Investment Joint Stock Company, presented a paper titled &quot;Application of Pile-Based Slab Bridges on PRC V+ Piles&quot; and &quot;High-Strength Duplex Concrete (HPC) Beams in Transportation Infrastructure Construction&quot;.<\/em><\/strong><\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" width=\"1280\" height=\"854\" src=\"https:\/\/www.cc1.vn\/wp-content\/uploads\/2025\/04\/ong-nhat.jpg\" alt=\"\" class=\"wp-image-17101\"\/><figcaption><strong><em>The paper &quot;Rotating Steel Pipe Piling Solutions for Urban Overpasses&quot; was presented by Engineer Higashi Masaya, Senior Manager of Nippon Steel Vietnam Co., Ltd.<\/em><\/strong><\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" width=\"1280\" height=\"854\" src=\"https:\/\/www.cc1.vn\/wp-content\/uploads\/2025\/04\/anh-Duong.jpg\" alt=\"\" class=\"wp-image-17102\"\/><figcaption><strong><em>Mr. Lu Trieu Duong, M.Sc., Technical Director of Phan Vu Investment Joint Stock Company, presented a paper titled &quot;Solutions for using centrifugal concrete piles for railway, road, and port infrastructure.&quot;<\/em><\/strong><\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" width=\"5472\" height=\"3648\" src=\"https:\/\/www.cc1.vn\/wp-content\/uploads\/2025\/04\/CAUCAN-295.jpg\" alt=\"\" class=\"wp-image-17103\"\/><figcaption><strong><em>Engineer Truong Quang Manh from Nippon Steel Vietnam Co., Ltd. shared many interesting insights with his presentation &quot;Applications of steel pipe piles for infrastructure projects&quot;.<\/em><\/strong><\/figcaption><\/figure>\n\n\n\n<p>Notably, at the same event, CC1 established the Viaduct Solutions Research Group, with voluntary participation from signatory parties. The group serves as a forum for exchanging and sharing technological and engineering solutions, while also acting as a sustainable collaborative ecosystem operating on a voluntary basis and without cost constraints. The group&#039;s goal is to create an open space where parties can jointly research, develop, and propose optimal solutions for transportation infrastructure in the Southern region, particularly solutions for optimizing viaduct systems.<\/p>\n\n\n\n<p>Accordingly, the Viaduct Solutions Research Group comprises the following nine companies and associations: Construction Company No. 1 \u2013 JSC (CC1), Hoa Binh Company Limited, Phan Vu Investment Joint Stock Company, Nippon Steel Vietnam Company Limited, Vietnam Industrial GS, VGSI Pile Co., Ltd, Invest Global Consulting and Investment Joint Stock Company, Vietnam Concrete Association, Vietnam Pile Business Association, and UTC2 Joint Stock Company. <\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" width=\"2560\" height=\"1707\" src=\"https:\/\/www.cc1.vn\/wp-content\/uploads\/2025\/04\/ky-ket-hoi-thao.jpg\" alt=\"\" class=\"wp-image-17104\"\/><figcaption><strong><em>Nine organizations have signed a cooperation agreement to research elevated bridge solutions for transportation infrastructure in the southern region.<\/em><\/strong><\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" width=\"3047\" height=\"2031\" src=\"https:\/\/www.cc1.vn\/wp-content\/uploads\/2025\/04\/CAUCAN-130.jpg\" alt=\"\" class=\"wp-image-17105\"\/><figcaption><em><strong>Mr. Phan Khac Long \u2013 Chairman of the Vietnam Pile Business Association, Vice Chairman of the Vietnam Concrete Association, delivered the closing remarks at the workshop.<\/strong><\/em><\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" width=\"2560\" height=\"1707\" src=\"https:\/\/www.cc1.vn\/wp-content\/uploads\/2025\/04\/chup-hinh-luu-niem.jpg\" alt=\"\" class=\"wp-image-17106\"\/><figcaption><strong><em>Delegates and experts took a commemorative photo, marking the successful conclusion of the program.<\/em><\/strong><\/figcaption><\/figure>\n\n\n\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Many solutions for constructing overpasses on traffic works, especially highways, to save costs, ensure the longevity of the works, especially minimizing negative impacts on the environment are discussed and discussed by experts, engineers, and consulting units.<\/p>","protected":false},"author":2,"featured_media":17104,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[63],"tags":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.cc1.vn\/en\/wp-json\/wp\/v2\/posts\/17095"}],"collection":[{"href":"https:\/\/www.cc1.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.cc1.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.cc1.vn\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.cc1.vn\/en\/wp-json\/wp\/v2\/comments?post=17095"}],"version-history":[{"count":4,"href":"https:\/\/www.cc1.vn\/en\/wp-json\/wp\/v2\/posts\/17095\/revisions"}],"predecessor-version":[{"id":17112,"href":"https:\/\/www.cc1.vn\/en\/wp-json\/wp\/v2\/posts\/17095\/revisions\/17112"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.cc1.vn\/en\/wp-json\/wp\/v2\/media\/17104"}],"wp:attachment":[{"href":"https:\/\/www.cc1.vn\/en\/wp-json\/wp\/v2\/media?parent=17095"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.cc1.vn\/en\/wp-json\/wp\/v2\/categories?post=17095"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.cc1.vn\/en\/wp-json\/wp\/v2\/tags?post=17095"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}