{"id":17336,"date":"2025-05-12T09:00:04","date_gmt":"2025-05-12T02:00:04","guid":{"rendered":"https:\/\/www.cc1.vn\/?p=17336"},"modified":"2025-05-12T10:40:24","modified_gmt":"2025-05-12T03:40:24","slug":"cc1-don-tiep-va-lam-viec-voi-doan-doi-tac-ccecc-trung-quoc","status":"publish","type":"post","link":"https:\/\/www.cc1.vn\/en\/2025\/05\/12\/cc1-don-tiep-va-lam-viec-voi-doan-doi-tac-ccecc-trung-quoc.html","title":{"rendered":"CC1 welcomes and works with the CCECC (China) partner delegation."},"content":{"rendered":"<p><strong>On the afternoon of May 11, 2025, representatives from Construction Corporation No. 1 \u2013 JSC (CC1) met and worked with China Civil Engineering Construction Corporation (CCECC). The meeting provided an opportunity for both sides to share experiences and explore future cooperation.<\/strong><\/p>\n\n\n\n<p>Attending the meeting, on the CC1 side were Mr. Phan Huu Duy Quoc \u2013 Chairman of the Board of Directors, Mr. Le Bao Anh \u2013 General Director, Mr. Dinh Van Hung \u2013 Deputy General Director, Mr. Nguyen Dinh Khoi \u2013 Director of the Construction Economics Division, along with senior leaders from other departments and divisions. On the Chinese side were Mr. Chen Si Chang \u2013 General Director of CCECC, Mr. Guo Chong Feng \u2013 Deputy General Director of CCECC, Mr. Song Yu \u2013 Director of the Vietnam branch, and many managers and leaders at various levels.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" width=\"2048\" height=\"1365\" src=\"https:\/\/www.cc1.vn\/wp-content\/uploads\/2025\/05\/CC1VSCCECC-LOGO-67.jpg\" alt=\"\" class=\"wp-image-17337\"\/><figcaption><strong><em>The meeting and working session took place at CC1&#039;s headquarters.<\/em><\/strong><\/figcaption><\/figure>\n\n\n\n<p>CCECC is a subsidiary of China Railway Construction Corporation (CRCC), one of the world&#039;s largest and most powerful integrated construction corporations. To date, with over 9,000 km of railways completed, CCECC accounts for 801% of China&#039;s total overseas railway construction projects.<\/p>\n\n\n\n<p>Meanwhile, CC1, with 46 years of formation and development, has affirmed its position as one of Vietnam&#039;s leading construction contractors through a series of key national projects such as Tan Son Nhat T3 terminal, Long Thanh International Airport, the North-South expressways, Metro Line 1 (Ben Thanh - Suoi Tien), Thu Thiem bridge, package 4 - National Highway 5 upgrade project in the Kingdom of Cambodia\u2026<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" width=\"2048\" height=\"1365\" src=\"https:\/\/www.cc1.vn\/wp-content\/uploads\/2025\/05\/2-1.jpg\" alt=\"\" class=\"wp-image-17347\"\/><figcaption><strong><em>Mr. Phan Huu Duy Quoc \u2013 Chairman of the Board of Directors of CC1 (on the right) and Mr. Chen Si Chang \u2013 General Director of CCECC at the meeting.<\/em><\/strong><\/figcaption><\/figure>\n\n\n\n<p>During the exchange, leaders of CC1 and CCECC discussed future cooperation opportunities between the two companies, aiming to fully exploit existing potential and maximize the strengths of both sides. This meeting between CC1 and CCECC also demonstrated CC1&#039;s proactive preparation in many aspects to be ready to &quot;seize&quot; opportunities from key national projects.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" width=\"2048\" height=\"1365\" src=\"https:\/\/www.cc1.vn\/wp-content\/uploads\/2025\/05\/CC1VSCCECC-LOGO-50.jpg\" alt=\"\" class=\"wp-image-17339\"\/><figcaption><strong><em>Overview of the meeting between CC1 and CCICC<\/em><\/strong><\/figcaption><\/figure>\n\n\n\n<p>Specifically, in the high-speed rail and urban rail sector, CC1 is researching and learning construction technologies from Japan, France, and China. Numerous professional activities to understand and share relevant technologies have been implemented, alongside the establishment of a strategic team to prepare for these projects.<\/p>\n\n\n\n<p>In particular, CC1 proactively approached the nuclear power sector early on, building a solid professional foundation despite it being a new industry in Vietnam. With experience in constructing many large thermal power plants nationwide such as Phu My, Mong Duong 2, Nghi Son 1 and 2, Vinh Tan 4, BOT Van Phong 1, Na Duong II, etc., CC1 has a clear advantage when transitioning to the nuclear power sector, which requires complex technical, safety, and management expertise. However, CC1 continues to send key personnel to learn about nuclear power plant construction from Russia and Japan, understanding the specific technical requirements of nuclear thermal power plants to guide training.<\/p>\n\n\n\n<p>For complex mega-projects, CC1 prioritizes joint ventures and partnerships with leading global contractors from Japan, South Korea, China, and Europe when necessary. This allows for collaborative support and learning from international partners, increasing the chances of winning bids on technically challenging and large-scale projects. Additionally, the company sends its engineers to attend training courses on EPC project management and the operation of modern construction machinery both domestically and internationally.<\/p>\n\n\n\n<p>It is clear that CC1 has proactively &quot;prepared one step ahead&quot; in many aspects, from technology and human resources to partnerships. All of this is seen as a solid foundation so that when large-scale national projects are implemented, CC1 can confidently participate in the construction of iconic national projects, as a leading contractor in Vietnam.<\/p>\n\n\n\n<p><strong><em>Here are some more photos from the event:<\/em><\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" width=\"4814\" height=\"3204\" src=\"https:\/\/www.cc1.vn\/wp-content\/uploads\/2025\/05\/DSC_8307.jpg\" alt=\"\" class=\"wp-image-17340\"\/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" width=\"2048\" height=\"1365\" src=\"https:\/\/www.cc1.vn\/wp-content\/uploads\/2025\/05\/CC1VSCCECC-LOGO-83.jpg\" alt=\"\" class=\"wp-image-17341\"\/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" width=\"2048\" height=\"1365\" src=\"https:\/\/www.cc1.vn\/wp-content\/uploads\/2025\/05\/CC1VSCCECC-LOGO-76.jpg\" alt=\"\" class=\"wp-image-17342\"\/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" width=\"2048\" height=\"1365\" src=\"https:\/\/www.cc1.vn\/wp-content\/uploads\/2025\/05\/CC1VSCCECC-LOGO-44.jpg\" alt=\"\" class=\"wp-image-17343\"\/><\/figure>\n\n\n\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>On the afternoon of May 11, 2025, representatives of Construction Corporation No. 1 \u2013 JSC (CC1) met and worked with China Civil Engineering Construction Corporation (CCECC). The meeting provided an opportunity for both sides to share experiences and discuss potential collaborations.<\/p>","protected":false},"author":2,"featured_media":17344,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[63],"tags":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.cc1.vn\/en\/wp-json\/wp\/v2\/posts\/17336"}],"collection":[{"href":"https:\/\/www.cc1.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.cc1.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.cc1.vn\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.cc1.vn\/en\/wp-json\/wp\/v2\/comments?post=17336"}],"version-history":[{"count":8,"href":"https:\/\/www.cc1.vn\/en\/wp-json\/wp\/v2\/posts\/17336\/revisions"}],"predecessor-version":[{"id":17355,"href":"https:\/\/www.cc1.vn\/en\/wp-json\/wp\/v2\/posts\/17336\/revisions\/17355"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.cc1.vn\/en\/wp-json\/wp\/v2\/media\/17344"}],"wp:attachment":[{"href":"https:\/\/www.cc1.vn\/en\/wp-json\/wp\/v2\/media?parent=17336"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.cc1.vn\/en\/wp-json\/wp\/v2\/categories?post=17336"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.cc1.vn\/en\/wp-json\/wp\/v2\/tags?post=17336"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}