{"id":19511,"date":"2025-11-22T20:33:00","date_gmt":"2025-11-22T13:33:00","guid":{"rendered":"https:\/\/www.cc1.vn\/?p=19511"},"modified":"2025-11-29T20:50:17","modified_gmt":"2025-11-29T13:50:17","slug":"lien-danh-do-cc1-dung-dau-vua-duoc-phe-duyet-trung-goi-thau-1-542-ty-dong-thuoc-du-an-nha-ga-t2-san-bay-dong-hoi","status":"publish","type":"post","link":"https:\/\/www.cc1.vn\/en\/2025\/11\/22\/lien-danh-do-cc1-dung-dau-vua-duoc-phe-duyet-trung-goi-thau-1-542-ty-dong-thuoc-du-an-nha-ga-t2-san-bay-dong-hoi.html","title":{"rendered":"A consortium led by CC1 has just been approved as the winning bidder for a VND 1.542 trillion contract for the Dong Hoi Airport Terminal 2 project."},"content":{"rendered":"<p>The consortium led by Construction Corporation No. 1 \u2013 JSC (CC1) has been approved as the winning bidder for Package No. 18: Construction and supply and installation of equipment for the passenger terminal and auxiliary works under Component Project 1 \u201cConstruction of Passenger Terminal T2 \u2013 Dong Hoi Airport\u201d.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" width=\"2000\" height=\"1200\" src=\"https:\/\/www.cc1.vn\/wp-content\/uploads\/2025\/11\/san-bay-DH.jpg\" alt=\"\" class=\"wp-image-19513\"\/><figcaption><strong><em>Perspective view of Dong Hoi Airport<\/em><\/strong><\/figcaption><\/figure>\n\n\n\n<p>The winning bidder is the DH18 consortium, comprising CC1, Thanh An Corporation, Truong Son Construction Corporation, ETC Technology Systems JSC, and Tan Thanh Refrigeration and Industrial Equipment Co., Ltd., with a winning bid price of VND 1.535 billion. This was also the only bidder participating in the tender package.<\/p>\n\n\n\n<p>The project has an estimated budget of 1,542 billion VND, with the Vietnam Airports Corporation as the investor.<\/p>\n\n\n\n<p>Component Project 1, &quot;Construction of Terminal 2 - Dong Hoi Airport,&quot; has a total investment of VND 1,750 billion. The investment objective is to build Terminal 2 at Dong Hoi Airport to meet the airport&#039;s current and future development needs, improve passenger service quality, and enhance operational efficiency. Upon completion, Terminal 2 will be a domestic passenger terminal with a capacity of 3 million passengers per year, contributing to the completion of the airport&#039;s infrastructure according to the approved plan.<\/p>\n\n\n\n<p>Over more than 46 years of formation and development, CC1 has firmly established itself as a pioneering enterprise in the construction industry, especially in the field of transportation infrastructure. A significant milestone marking the beginning of this journey was the Thu Thiem Bridge \u2013 the first bridge across the Saigon River after the country&#039;s reunification, which commenced construction in 2005. From this important milestone, CC1 has continuously participated in a series of key transportation projects nationwide, such as the new Dong Nai Bridge, Hoa An Bridge, An Hao Bridge, the Ben Thanh \u2013 Suoi Tien Metro Line 1, the North-South Expressway projects, Long Thanh International Airport, and Tan Son Nhat Terminal 3\u2026<\/p>\n\n\n\n<p>Recently, CC1 continued to demonstrate its outstanding capabilities by being approved as the winning bidder for a 1,542 billion VND contract for the T2 Passenger Terminal project at Dong Hoi Airport, proving the corporation&#039;s construction capacity and reputation are increasingly affirmed in projects with high technical requirements and strict deadlines.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" width=\"2560\" height=\"1707\" src=\"https:\/\/www.cc1.vn\/wp-content\/uploads\/2025\/11\/Layer-1.png\" alt=\"\" class=\"wp-image-19514\"\/><figcaption><strong><em>CC1 has demonstrated outstanding construction capabilities through a series of key national transportation infrastructure projects. <\/em><\/strong><\/figcaption><\/figure>\n\n\n\n<p>Notably, at the beginning of 2025, CC1 was honored as the Top 1 Reputable Infrastructure and Industrial Construction Contractor of 2025, marking well-deserved recognition for the tireless efforts of the entire company. This title not only demonstrates its leading position but also affirms CC1&#039;s commitment to continuing to pioneer the implementation of projects of national strategic importance, making practical contributions to the sustainable development of the country.<\/p>","protected":false},"excerpt":{"rendered":"<p>The consortium led by Construction Corporation No. 1 \u2013 JSC (CC1) has just been approved as the winning bidder for Package No. 18: Construction and supply and installation of equipment for the passenger terminal and auxiliary works under Component Project 1 \u201cConstruction of the Terminal [\u2026]<\/p>","protected":false},"author":2,"featured_media":19513,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[63],"tags":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.cc1.vn\/en\/wp-json\/wp\/v2\/posts\/19511"}],"collection":[{"href":"https:\/\/www.cc1.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.cc1.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.cc1.vn\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.cc1.vn\/en\/wp-json\/wp\/v2\/comments?post=19511"}],"version-history":[{"count":3,"href":"https:\/\/www.cc1.vn\/en\/wp-json\/wp\/v2\/posts\/19511\/revisions"}],"predecessor-version":[{"id":19517,"href":"https:\/\/www.cc1.vn\/en\/wp-json\/wp\/v2\/posts\/19511\/revisions\/19517"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.cc1.vn\/en\/wp-json\/wp\/v2\/media\/19513"}],"wp:attachment":[{"href":"https:\/\/www.cc1.vn\/en\/wp-json\/wp\/v2\/media?parent=19511"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.cc1.vn\/en\/wp-json\/wp\/v2\/categories?post=19511"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.cc1.vn\/en\/wp-json\/wp\/v2\/tags?post=19511"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}