{"id":2153,"date":"2018-06-06T14:00:00","date_gmt":"2018-06-06T14:00:00","guid":{"rendered":"https:\/\/d.cc1.vn\/?p=2153"},"modified":"2022-05-11T08:01:37","modified_gmt":"2022-05-11T08:01:37","slug":"tong-cong-ty-xay-dung-so-1-ctcp-da-trung-thau-du-an-nha-may-dien-mat-troi-krongpa-49mwac","status":"publish","type":"post","link":"https:\/\/www.cc1.vn\/en\/2018\/06\/06\/tong-cong-ty-xay-dung-so-1-ctcp-da-trung-thau-du-an-nha-may-dien-mat-troi-krongpa-49mwac.html","title":{"rendered":"CC1 won the bid for Krongpa Solar Power Plant project (49 MWac)"},"content":{"rendered":"<p>On April 4, 2018, JGC Vietnam Co., Ltd. (Main Contractor) and Construction Corporation No. 1 (Subcontractor) signed a contract for the Construction Package of Krongpa Solar Power Plant in Krongpa district, Gia Lai province with a contract value of \u2248 140 billion. Construction progress of the project from April 2018 to October 2018. Some pictures at the scene:<\/p>\n\n\n\n<p><\/p>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-full\"><img loading=\"lazy\" width=\"680\" height=\"510\" src=\"https:\/\/d.cc1.vn\/wp-content\/uploads\/2022\/04\/6c9af9b4d7e039be60f1.jpg\" alt=\"\" class=\"wp-image-2154\"\/><\/figure><\/div>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-full\"><img loading=\"lazy\" width=\"680\" height=\"510\" src=\"https:\/\/d.cc1.vn\/wp-content\/uploads\/2022\/04\/7c0ce072d4263a786337.jpg\" alt=\"\" class=\"wp-image-2155\"\/><\/figure><\/div>\n\n\n\n<p><\/p>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-full\"><img loading=\"lazy\" width=\"680\" height=\"383\" src=\"https:\/\/d.cc1.vn\/wp-content\/uploads\/2022\/04\/e57d2af49efa70a429eb.jpg\" alt=\"\" class=\"wp-image-2156\"\/><\/figure><\/div>","protected":false},"excerpt":{"rendered":"<p>On April 4, 2018, JGC Vietnam Co., Ltd (main contractor) and Construction Corporation No. 1 (sub-contractor) signed a contract to execute the Construction Package of Krongpa Solar Power Plant in District 1. Krongpa, Gia Lai province with a contract value of ~ 140 billion. Progress [\u2026]<\/p>","protected":false},"author":1,"featured_media":2155,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[63],"tags":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.cc1.vn\/en\/wp-json\/wp\/v2\/posts\/2153"}],"collection":[{"href":"https:\/\/www.cc1.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.cc1.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.cc1.vn\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.cc1.vn\/en\/wp-json\/wp\/v2\/comments?post=2153"}],"version-history":[{"count":2,"href":"https:\/\/www.cc1.vn\/en\/wp-json\/wp\/v2\/posts\/2153\/revisions"}],"predecessor-version":[{"id":5612,"href":"https:\/\/www.cc1.vn\/en\/wp-json\/wp\/v2\/posts\/2153\/revisions\/5612"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.cc1.vn\/en\/wp-json\/wp\/v2\/media\/2155"}],"wp:attachment":[{"href":"https:\/\/www.cc1.vn\/en\/wp-json\/wp\/v2\/media?parent=2153"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.cc1.vn\/en\/wp-json\/wp\/v2\/categories?post=2153"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.cc1.vn\/en\/wp-json\/wp\/v2\/tags?post=2153"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}