{"id":2205,"date":"2017-11-16T16:19:00","date_gmt":"2017-11-16T16:19:00","guid":{"rendered":"https:\/\/d.cc1.vn\/?p=2205"},"modified":"2022-10-27T08:52:36","modified_gmt":"2022-10-27T01:52:36","slug":"le-ky-ket-thu-chap-thuan-thuc-hien-goi-so-1-thuoc-du-an-khu-cong-nghiep-wha-hemaraj-1-nghe-an-viet-nam","status":"publish","type":"post","link":"https:\/\/www.cc1.vn\/en\/2017\/11\/16\/le-ky-ket-thu-chap-thuan-thuc-hien-goi-so-1-thuoc-du-an-khu-cong-nghiep-wha-hemaraj-1-nghe-an-viet-nam.html","title":{"rendered":"<br>Signing Ceremony for Implementation Approval Letter of Package 1 of WHA Hemaraj 1 Industrial Park Project \u2013 Nghe An, Vietnam"},"content":{"rendered":"<p>On November 15, 2017, WHA Hemaraj Cienco4 Nghe An Joint Stock Company and Construction Corporation No. 1 (CC1) held the signing ceremony of the Letter of Approval for the implementation of Package No. 1 \u2014 Construction of Backfill, Dyke, Road and Drainage under WHA Hemaraj 1 Industrial Park Project \u2013 Nghe An. This package is expected to be constructed in 390 days from the Ground-breaking date, which is worth more than 311 billion VND.<\/p>\n\n\n\n<p>The Contract Agreement is being prepared by the two parties and will be signed in the nearest future.<\/p>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-full\"><img loading=\"lazy\" width=\"640\" height=\"417\" src=\"https:\/\/d.cc1.vn\/wp-content\/uploads\/2022\/04\/IMG_8261.jpg\" alt=\"\" class=\"wp-image-2206\"\/><\/figure><\/div>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-full\"><img loading=\"lazy\" width=\"640\" height=\"417\" src=\"https:\/\/d.cc1.vn\/wp-content\/uploads\/2022\/04\/IMG_8270.jpg\" alt=\"\" class=\"wp-image-2207\"\/><\/figure><\/div>","protected":false},"excerpt":{"rendered":"<p>On November 15, 2017, WHA Hemaraj Cienco4 Nghe An Joint Stock Company and Construction Corporation No. 1 (CC1) held a signing ceremony of the Letter of Acceptance for the implementation of Package No. 1 - Construction of Leveling, Dike, Road , Drainage of WHA Hemaraj Industrial Park 1 - Nghe An Project. [\u2026]<\/p>","protected":false},"author":1,"featured_media":2207,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[63],"tags":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.cc1.vn\/en\/wp-json\/wp\/v2\/posts\/2205"}],"collection":[{"href":"https:\/\/www.cc1.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.cc1.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.cc1.vn\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.cc1.vn\/en\/wp-json\/wp\/v2\/comments?post=2205"}],"version-history":[{"count":3,"href":"https:\/\/www.cc1.vn\/en\/wp-json\/wp\/v2\/posts\/2205\/revisions"}],"predecessor-version":[{"id":9376,"href":"https:\/\/www.cc1.vn\/en\/wp-json\/wp\/v2\/posts\/2205\/revisions\/9376"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.cc1.vn\/en\/wp-json\/wp\/v2\/media\/2207"}],"wp:attachment":[{"href":"https:\/\/www.cc1.vn\/en\/wp-json\/wp\/v2\/media?parent=2205"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.cc1.vn\/en\/wp-json\/wp\/v2\/categories?post=2205"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.cc1.vn\/en\/wp-json\/wp\/v2\/tags?post=2205"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}