                    | Investor | Management Board of HCMC Water Sanitation Project | 
| Construction unit | Construction Corporation No. 1 – JSC (CC1) | 
| Location | Ho Chi Minh City | 
| Value | 350.85 billion VND | 
| Progress | 2011-2012 | 
- Bidding Package No. 10D Interface Between Embankment And Abutment Along Nhieu Loc-Thi Nghe Canal.
-Construction of retaining walls with prestressed reinforced concrete sheet piles 18m long, embankments of canal sections in Nhieu Loc-Thi Nghe basin with a total length of 61,530m including piling works, excavation and transportation. move to the designated location, construct retaining walls at the locations of outlet outlets to the canal, reinforce bridge abutments.