Event – CC1 – Page 7

Top News

CC1 CÙNG NGÂN HÀNG TMCP SÀI GÒN – HÀ NỘI (SHB) KHỞI CÔNG DỰ ÁN TÒA NHÀ VĂN PHÒNG TẠI TP.HCM

Sáng ngày 04/7/2026, Tổng Công ty Xây dựng Số 1 – CTCP (CC1) đã phối hợp cùng Ngân hàng TMCP Sài Gòn – Hà Nội (SHB) tổ chức Lễ khởi công Dự án Tòa nhà Văn phòng SHB tại số 41–43–45 Pasteur, phường Sài Gòn, TP.HCM.  Tham dự buổi lễ, về phía CC1 có ông […]

NEARLY 15 KM OF THE HO CHI MINH CITY RING ROAD 3 OVERPASS IS COMPLETED BEFORE ITS TECHNICAL OPENING ON DECEMBER 19TH.

With only a few days left before the December 19th technical opening date, the Ho Chi Minh City Ring Road 3 construction site is entering its peak construction phase with a frantic pace day and night. On the 14.7km elevated section on the eastern side, a key component undertaken by Construction Corporation No. 1 – JSC (CC1), numerous […]

CAN THO – CA MAU EXPRESSWAY: REACHES 95% PROGRESS AHEAD OF TECHNICAL OPENING DATE

On the Can Tho – Ca Mau expressway construction site, in the days leading up to the technical opening date, the pace of construction has been pushed to its highest level. As the direct contractor involved in the project, Construction Corporation No. 1 – JSC (CC1) is focusing all its resources, […]

CONSTRUCTION OF CAT LAI BRIDGE AND DONG NAI 2 BRIDGE CONNECTING TO HO CHI MINH CITY WILL BEGIN IN 2026

On December 10th, at the 8th session of the 10th term (2021-2026), the Dong Nai Provincial People's Council voted to approve two draft resolutions on the investment policy for the construction of Long Hung Bridge (Dong Nai 2 Bridge) and Cat Lai Bridge. Accordingly, the two projects […]

CC1 Meets MLIT: Opening a New Chapter for International Cooperation in the Vietnamese Market

On the morning of December 5, 2025, Construction Corporation No. 1 – JSC (CC1) welcomed a delegation from the Japanese Ministry of Land, Infrastructure, Transport and Tourism (MLIT) as part of a visit to explore cooperation opportunities in the Vietnamese market. This was […]

UNTOLD STORIES BEHIND THE CONSTRUCTION SITE (PART II): LONG THANH AIRPORT - WHERE "STEEL ROSES" CONTINUE TO FOSTER THE SPIRIT OF THE BUILDER.

In the office space filled with paperwork, with desks neatly arranged in rows, amidst the seating of engineers and managers, are glimpses of women with steely spirits. They hold positions ranging from accountant, project secretary, QS engineer, HSE engineer, and other staff members.

A consortium of investors led by CC1 has been approved to propose the construction of the Long Hung Bridge.

The People's Committee of Dong Nai province has officially approved the consortium of Construction Corporation No. 1 – JSC (CC1), CC1 Investment Joint Stock Company, and Southern Infrastructure & Energy Joint Stock Company as the proposed investor for the Long Hung Bridge construction project.

CC1 is part of a three-member consortium that won the 1.979 billion VND bid to build a Youth Cultural Center in Ho Chi Minh City.

The Ho Chi Minh City Project Management Board for Civil and Industrial Construction Projects has just announced the results of the contractor selection for the Construction and Supply, Installation of Equipment; and Demolition of Existing Structures package under the Thanh Hoa Cultural Center Construction Project […]

CC1 Trade Union enters the 2025-2030 term, maintaining its role as a "reliable bridge" for workers.

Recently in Ho Chi Minh City, the Trade Union of Construction Corporation No. 1 – JSC (CC1) successfully held its 11th Congress of Delegates, for the term 2025–2030. The Congress took place in the context of the country continuing to promote comprehensive reforms, opening up many opportunities […]

CC1 joins hands to support flood victims and employee families facing difficulties.

Immediately after the historic floods that caused serious damage in Dak Lak province (formerly Phu Yen), a delegation from Construction Corporation No. 1 – JSC (CC1) directly visited the heavily affected areas in Vinh Phu village (Phu Hoa 1 commune), Phuoc village […]