CC1 LARGE CONCRETE PLANT PROJECT Quang Trach 1 Thermal Power Plant
On May 26, 2023, CC1 as a domestic member of the EPC General Contractor consortium in charge of the entire construction and installation part of the main factory, poured the first large batch of foundation concrete. for the Quang Trach 1 Thermal Power Plant project. With a volume of 2560 m³ for the generator turbine of unit #1, this is the first large concrete batch of the project this year.